![]() It is available in plain steel and hot-dip galvanized finish. Other sizes can be designed according to the requirements of the client. The system is suitable for internal and external slabs with depths from 125 mm to 250 mm. The DOWELCRADLE Load Transfer system allows extremely quick and simple installation of the system by one person. The wire cradle pre-sets the height of the dowel in the slab as well as the distance between the centers of the dowels. Dowels and sleeves are held by the cradle, aligned and suspended in position in the middle of the slab with the required dowel spacing, thereby ensuring correct positioning and alignment of the individual dowels and sleeves. The system consists of a positioning wire cradle and load transfer system. DOWELCRADLEs permit slab movement and ensure free movement of the slab as required, thereby eliminating the principal cause of shrinkage cracks at the joint and minimizing the vertical displacement of the slabs. ![]() Available with plate and round bar dowels to meet the requirements of every application.ĭOWELCRADLEs are designed for use in concrete slabs or pavements where a sawn or other induced free-movement contraction joint is required. To create a project 1 After having started Allplan 2014, you can create a new project straight form the Welcome screen. ![]() You will start by creating a project for the exercises in this tutorial. DOWELCRADLE is a prefabricated leave-in-place load transfer system dedicated to the construction of sawn or induced contraction joints. 16 Creating a project Allplan 2014 Creating a project In Allplan 2014, you work with drawing files and NDW files. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |